|
|
TM9-2320-270-20-2
PRIMARY AIR RESERVOIR
This task covers:
a. Removal (page 4-669)
d. Inspection/Replacement (page 4-672)
b. Disassembly (page 4-670)
e. Assembly (page 4-674)
c. Cleaning (page 4-672)
f. Installation (page 4-674)
INITIAL SETUP
Tools
Materials/Parts
Hammer, plastic
Lockwasher, bracket arms to reservoir
Handle, ratchet, 1/2-inch drive
support (two required)
Pliers, long-nose, round
Lockwasher, bracket arms to thru-bolt
Socket, 9/16-inch, 1/2-inch drive
(two required)
Vise
Soap, liquid (item 14, appendix C)
Wrench, open-end, 9/16-inch
Tags, marking (item 18, appendix C)
Wrench, open-end, 15/16-inch
Tape, teflon (item 22, appendix C)
Wrench, open-end, 1 1/16-inch
Personnel Required
Wrench, open-end, 1 1/8-inch
One
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
WARNING
Make sure all pressure is drained from air system before disconnecting air lines. Parts
under pressure can, when removed, fly off with great force causing injury to personnel.
NOTE
Tag air lines according to general maintenance instructions (page 4-1).
1.
Drain (TM 9-2320-270-10).
Air system
4-669
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |