Click here to make tpub.com your Home Page

Page Title: INSTALLATION CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-2
WET RESERVOIR - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION CONTINUED
Thread through.
Drain cable (2)
57. Loop clamp (1)
Push through hole using tape measure,
Drain cable (2)
58. Drain valve (3)
position so end is 1 1/2 to 2 inches
(3.8 to 4 centimeters) from valve lever.
a. Put on.
stop (4)
59. Drain cable (2)
b. Using tape measure, position 1/4 to
1/2 inch (.63 to 1.3 centimeters)
from valve lever.
Screw in and tighten using screwdriver and
Screw (5)
60. stop (4) to
slip-joint pliers.
cable (2)
NOTE
FOLLOW-ON MAINTENANCE: Check for leaks (page 4-1).
TASK ENDS HERE
TA240437
4-668

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business