Click here to make tpub.com your Home Page

Page Title: REPAIR AT CONNECTION CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9-2320-270-20-2
NYLON TUBING - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
REPAIR AT CONNECTION CONTINUED
Using long-nose pliers pull out and in-
Insert (3)
31. Nylon tube (1) or
spect for cracks, dents, or being crushed
adapter (2)
by sleeve (4).
Inspect for cracks and stripped threads.
Nut (5)
32.
To replace, go to step 35.
Inspect for cracks or deep grooves.
Sleeve (4)
33.
To replace, go to step 36.
a. Inspect for cracks, punctures or
Nylon tube (1)
34.
breaks.
b. Using pocket knife, cut behind sleeve
or beyond damage.
c. Get rid of.
If replacement is necessary, slide off.
Nut (5)
35. Nylon tube (1)
Slide on.
New nut (5) and new
36.
sleeve (4)
Push in and using plastic hammer, seat.
Insert (3)
37. Adapter (2)
Lube end lightly with soap and push in
Nylon tube (1)
36.
until seated.
Nut (5)
Screw on and tighten using 5/8-inch
39. Nylon tube (1) to
wrench.
adapter (2)
Check for leaks (page 4-1).
Both connections
40.
4-640

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business