Click here to make tpub.com your Home Page

Page Title: INSTALLATION CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320270-20-2
MAIN TRANSMISSION TO AUXILIARY TRANSMISSION PROPELLER SHAFT CONTINUED
ACTION
ITEM
REMARKS
LOCATION
Put on.
Dust cap (9), steel
29. Splined shaft (1)
washer (10), and cork
washer (11)
Put into sleeve yoke (12).
Cross (13)
30. Sleeve yoke (12)
Two bearing and cap
Using hammer, tap in.
31.
assemblies (14)
Four screws (15) and
Screw in and tighten using 9/16-inch
32. Two bearing and cap
assemblies to sleeve
two lock plates (16)
socket and handle.
yoke (12)
Two lock plates (16)
Using hammer and punch, bend up
33. Sleeve yoke (12)
tabs (17).
a. Lineup marks.
34.
Splined shaft (1),
b. Push splined shaft (1) into sleeve
and flange yoke (2)
yoke (12) as far as possible.
Screw on and tighten using pipe wrench.
Dust cap (9), steel
35.
washer (10), and
cork washer (11)
TA240380
4-581

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business