Click here to make tpub.com your Home Page

Page Title: INSTALLATION CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-2
MAIN TRANSMISSION TO AUXILIARY TRANSMISSION PROPELLER SHAFT - CONTINUED
ACTION
ITEM
REMARKS
LOCATION
INSTALLATION CONTINUED
With the aid of an assistant, and
Sleeve yoke (2) with
38.
Auxiliary trans-
splined shaft (3)
mission yoke (1)
using pry bar, place in position.
and flange yoke (4)
Four bearing and
Auxiliary trans-
Using hammer, tap in.
37.
It maybe necessary to rotate drive
cap assemblies (5)
mission yoke (1)
shaft.
Eight screws (6) and
Two bearing and cap
Screw in and tighten using 9/16-inch
38.
four lock plates (7)
assemblies (5) to
socket and handle.
auxiliary trans-
mission yoke (1)
Four lock plates (7)
Auxiliary trans-
Using hammer and punch, bend up
39.
mission yoke (1)
tabs (8).
Rotate and check operation of joints.
Cross (9) and four
Sleeve yoke (2) and
40.
If any joints bind, tap with hammer
bearing and cap
auxiliary trans-
to relieve pressure.
assemblies (5)
mission yoke (1)
TA240381
4-452

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business