|
|
TM 9-2320-270-20-2
MAIN TRANSMISSION TO AUXILIARY TRANSMISSION PROPELLER SHAFT - CONTINUED
ACTION
REMARKS
ITEM
LOCATION
INSTALLATION CONTINUED
Flange yoke (2)
Put cross (3) into splined shaft (1).
Splined shaft (1)
24.
Using hammer, tap in.
Two bearing and cap
25.
assemblies (4)
Screw in and tighten using 9/16-inch
Four screws (5) and
Two bearing and
26.
socket and handle.
two lock plates (6)
cap assemblies (4)
to splined shaft (1)
Two lock plates (6)
Using hammer and punch, bend up
Splined shaft (1)
27.
tabs (7).
Rotate and check operation of joints.
Splined shaft (1)
Cross (3), and four
28.
If any joints bind, tap with hammer
bearing and cap as-
and flange yoke (2)
to relieve pressure.
semblies (4) and (8)
TA240379
4-580
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |