|
|
TM 9-2320-270-20-1
DIRECTIONAL SIGNAL CONTROL
This task covers:
a. Removal (page 4-314)
b. Installation (page 4-316)
INITIAL SETUP
Personnel Required
Tools
One
Pliers, diagonal-cutting
Screwdriver, cross-tip, number 2
Equipment Condition
Screwdriver, flat-tip, 3/8-inch
Pliers, slip-joint, straight-nose
Battery ground cable disconnected
Materials/Parts
Instrument panel open (page 4-244).
Tag, marking (item 18, appendix C)
Wrap, tie (item 24, appendix C)
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
CAUTION
Make sure battery ground cable is disconnected before replacing the directional signal
control to prevent possible damage to electrical system.
NOTE
Tag wires according to general maintenance instructions (4-1).
Tie wrap (2)
a. Using cutting pliers, cut.
1. Wires (1)
b. Get rid of.
Red wire (4)
Unplug.
2. Wire 294
connector (3)
4-314
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |