Click here to make tpub.com your Home Page

Page Title: BLACKOUT LIGHT SWITCH
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-270-20-1
WORK LIGHT SWITCH - CONTINUED
INSTALLATION - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
1. Connect battery ground cable (page 4-444).
2. Check operation (TM 9-2320-270-10).
3. Close instrument panel (page 4-244).
TASK ENDS HERE
BLACKOUT LIGHT SWITCH
This task covers:
a. Removal (page 4-298)
b. Installation (page 4-300)
INITIAL SETUP
Personnel Required
Tools
One
Screwdriver, flat-tip, 1/4-inch,
Wrench, box, 9/18-inch
Equipment Condition
Materials/Parts
Battery ground cable disconnected
Lockwasher, terminal screw
Instrument panel open (page 4-244).
(12 required)
Tag, marking (item 18, appendix C)
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
WARNING
Make sure battery ground cable is disconnected before doing this task. Failure to dis-
connect battery ground cable can cause personal injury and damage to electrical
system.
NOTE
Tag wires according to general maintenance instructions, (page 4-1).
4-298

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business