|
|
TM 9-2320-270-20-1
HEAT EXCHANGER HOSES, TUBES, AND FITTINGS - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
1. Fill cooling system (TM 9-2320-270-10).
2. Check for leaks (page 4-1).
3. Install side panels (TM 9-2320-270-10).
TASK ENDS HERE
THERMOSTATS
This task covers:
a. Right Thermostat Removal
d. Testing (page 4-178)
e. Left Thermostat Installation (page 4-179)
b. Left Thermostat Removal (page 4-176)
f. Right Thermostat Installation (page 4-180)
c. Cleaning and Inspection (page 4-178)
INITIAL SETUP
Tools
Materials/Parts - Continued
Extension, 5-inch, 3/8-inch drive
Gasket, thermostat housing to cover
Hammer, rubber
Lockwasher (eight required)
Handle (J7079-2)
Packing (two required)
Handle, ratchet, 3/8-inch drive
Handle, ratchet, 1/2-inch drive
Personnel Required
Installer (J8550)
Key, socket-head screw, 3/16-inch
One
Knife, putty
Screwdriver, flat-tip, 1/4-inch,
Equipment Condition
Socket, 9/16-inch, 3/8-inch drive
Wrench, open-end, 3/4-inch
Shutdown solenoid removed for right side
thermostat (page 4-422).
Materials/Pads
Radiator guards removed (page 4-151).
Container, 35 gallon capacity
Gasket, thermostat housing to cover
4-173
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |