|
|
TM 9-2320-270-20-1
HEAT EXCHANGER HOSES, TUBES, AND FlTTlNGS
This task covers:
c. Installation (page 4-170)
a. Removal (page 4-168)
b. Cleaning and Inspection (page 4-170)
INITIAL SETUP
Materials/Pafts
Tools
Container
Extension, 5-inch, 3/8-inch drive
Lockwasher, brace to clamp (two required)
Handle, ratchet, 3/8-inch drive
Lockwasher, brace to frame
Pry bar
Lockwasher, bracket to frame (four required)
Screwdriver, flat-tip, 1/4-inch,
Socket, 7/16-inch, 3/8-inch drive
Personnel Required
Socket, 9/16-inch, 3/8-inch drive
Wrench, open-end, 7/16-inch
One
Wrench, open-end, 1/2-inch
Wrench, open-end, 9/16-inch
Equipment Condition
Wrench, pipe, 14-inch
Side panels removed (TM 9-2320-270-10).
ACTION
REMARKS
ITEM
LOCATION
REMOVAL
Put container underneath.
a.
Plug (2)
1. Heat exchanger (1)
Using 9/16-inch wrench, unscrew and
b.
take out.
c. When coolant stops draining, screw in
and tighten using 9/16-inch wrench.
d. Get rid of fluid (page 4-1).
TA239914
4-168
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |