|
|
TM 9-2320-269-34-1
POWER DIVIDER LOCKOUT ASSEMBLY
This task covers:
a. Removal (page 2-898)
d. Inspection/Replacement (page 2-901)
b. Disassembly (page 2-899)
e. Assembly (page 2-902)
c.
Cleaning (page 2-900)
f.
Installation (page 2-904)
INITIAL SETUP
Personnel Required
Tools
Driftpin, brass, 1/2-inch
One
Face, hammer, inserted, medium-plastic
Equipment Condition
Hammer, ball-peen, machinist's, 3-lb
Hammer, plastic-face, medium
Air reservoir drained (TM 9-2320-269-20-1)
Handle, ratchet, 3/8-inch drive
Holder, inserted hammer face
Puller, slide hammer
Screwdriver, flat-tip, 1/4-inch
Scribe, machinist's
Socket, 3/8-inch drive, 7/16-inch
Socket, 3/8-inch drive, 9/16-inch
Socket, deep well, 3/8-inch drive,
9/16-inch
Wrench, open-end, 9/16-inch
Wrench, open-end, 7/8-inch
Materials/Parts
Gasket, shift fork housing
Felt strip, piston (two required)
Filter, shift cylinder body
Lockwasher, hose clip
Lockwasher, shift cylinder cover
(four required)
Packing, preformed, piston
Packing, preformed, shift fork body
Packing, preformed, shift fork shaft
Packing, preformed, shift cylinder cover
Rags, wiping (item 42, appendix B)
Seal, oil, shift fork housing (as needed)
Solvent, drycleaning (item 49, appendix B)
2-897
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |