Click here to make tpub.com your Home Page

Page Title: POWER DIVIDER LOCKOUT ASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
POWER DIVIDER LOCKOUT ASSEMBLY
This task covers:
a. Removal (page 2-898)
d. Inspection/Replacement (page 2-901)
b. Disassembly (page 2-899)
e. Assembly (page 2-902)
c.
Cleaning (page 2-900)
f.
Installation (page 2-904)
INITIAL SETUP
Personnel Required
Tools
Driftpin, brass, 1/2-inch
One
Face, hammer, inserted, medium-plastic
Equipment Condition
Hammer, ball-peen, machinist's, 3-lb
Hammer, plastic-face, medium
Air reservoir drained (TM 9-2320-269-20-1)
Handle, ratchet, 3/8-inch drive
Holder, inserted hammer face
Puller, slide hammer
Screwdriver, flat-tip, 1/4-inch
Scribe, machinist's
Socket, 3/8-inch drive, 7/16-inch
Socket, 3/8-inch drive, 9/16-inch
Socket, deep well, 3/8-inch drive,
9/16-inch
Wrench, open-end, 9/16-inch
Wrench, open-end, 7/8-inch
Materials/Parts
Gasket, shift fork housing
Felt strip, piston (two required)
Filter, shift cylinder body
Lockwasher, hose clip
Lockwasher, shift cylinder cover
(four required)
Packing, preformed, piston
Packing, preformed, shift fork body
Packing, preformed, shift fork shaft
Packing, preformed, shift cylinder cover
Rags, wiping (item 42, appendix B)
Seal, oil, shift fork housing (as needed)
Solvent, drycleaning (item 49, appendix B)
2-897

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business