Click here to make tpub.com your Home Page

Page Title: ASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
POWER DIVIDER LOCKOUT ASSEMBLY - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
ASSEMBLY
23.
Piston (1)
New preformed pack-
Put on.
ing (2) and two new
felt strips (3)
24.
Shift fork
New oil seal (5)
Drive in using 3-lb ball-peen hammer
and
housing (4)
1/2-inch brass driftpin.
25.
Shift fork (6)
Put in position.
26.
Shift fork (6) and
Shift fork shaft (7)
Drive in using 3-lb ball-peen hammer
and
shift fork housing (4)
1/2-inch inch brass driftpin.
27.
Shift fork (6)
Setscrew (8)  a.
Line up holes.
b.
Screw in, and tighten using 1/4-inch
flat-tip screwdriver.
28.
Shift fork
Dust cap (9)
Tap in using 3-lb ball-peen hammer.
housing (4)
29.
Shift fork
New preformed
Place in position.
housing (4)
packing (10) and
shift cylinder
body (11)
30.
Shift cylinder
Screw (12)
Screw in, and tighten using 9116-inch
body (11)
socket and ratchet handle with 3/8-inch
drive.
31.
Shift fork shaft (7)
Spring (13) and
Put on.
piston (1)
32.
New preformed
a.
Push down on piston (1) and hold.
packing (14), washer
b.
Put on parts.
(15), and screw (16)
c.
Screw in, and tighten using 9116-inch
socket and ratchet handle with 3/8-inch
drive.
33.
New preformed
Place in position.
packing (17) and
shift cylinder
cover (18)
2-902

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business