|
|
TM 9-2320-269-34-1
TRANSMISSION SELECTOR LEVER AND SELECTOR LEVER AND LINKAGE
This task covers:
a. Removal and Disassembly
c.
Inspection/Replacement (page 2-796)
d. Assembly and Installation (page 2-796)
b. Cleaning (page 2-795)
e. Shift Linkage Adjustment (page 2-801)
INITIAL SETUP
Materials/ Parts
Tools
Lamp, indicator
Locknut, pivot
Compressor, reciprocating air,
Lockwashers, bracket (two required)
power driven
Lockwashers, clamp (two required)
Extension, 3/8-inch drive, 6-inch
Lockwashers, U-bolt (two required)
Goggles, safety
Pin, cotter
Gun, air blow
Pin, cotter, swivel
Handle, ratchet, 1/2-inch drive
Solvent, drycleaning (item 49, appendix B)
Hose, air compressor
Tag, marking (item 50, appendix B)
Key, socket-head screw, 118-inch
Pliers, slip-joint, angle-nose
Personnel Required
Screwdriver, cross-tip, number two
One
Screwdriver, flat-tip, 3/8-inch
Socket, 1/2-inch drive, 1/2-inch
Socket, 1/2-inch drive, 9/16-inch
Wrench, open-end, 3/8-inch
Wrench, open-end, 1/2-inch
Wrench, open-end, 11-mm
Wrench, pliers
Wrench, torque, 1/2-inch drive,
0 - 150 ft-lb capacity
2-789
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |