Click here to make tpub.com your Home Page

Page Title: CONTROL VALVE ASSEMBLY INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
TRANSMISSION SUBASSEMBLIES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
CONTROL VALVE ASSEMBLY INSTALLATION
118.
Transmission
Governor
Put in place.
housing (1)
checkball (2)
119
Control valve
Position so actuator pin (4) enters housing
assembly (3)
bore and groove in range selector valve is
aligned with pin on lever.
120.
Control valve
17 screws (5) and
a. Put into position.
assembly (3)
one longer screw (6)
b. Tighten finger tight.
121.
Governor oil
Put in tube bore.
screen (7)
122.
Transfer plate (8)
Two governor oil
Push into bores.
tubes (9)
123.
Control valve
Two governor oil
Push into bores.
assembly (3)
tubes (9)
124.
Transmission
Transfer plate (8)
Place into position.
housing (1)
125.
Transfer plate (8)
Two screws (10)
a. Place in position.
b. Screw in finger tight.
c. Place seven 1/4 - 20 x 2 1/2-inch
guide screws in position, and screw
in finger tight.
d. Using 7/16-inch socket and torque han-
dle with 1/2-inch drive, tighten to
9 - 11 ft-lb (12.2 - 14.9 N m) of
e. Unscrew seven guide screws and take
out.
126.
Control valve
Detent spring and
Place into position to engage notch in
assembly (3)
roller assembly (11)
detent lever (12).
2-686

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business