Click here to make tpub.com your Home Page

Page Title: Section VI. COOLING SYSTEM
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-269-34-1
Section VI. COOLING SYSTEM
Page
Page
Left Water Outlet ..................................2-391
Water Pump ........................................
Radiator.................................................2-388
Water Pump-to-Crankcase
Right Water Outlet ............................... 2-395
Manifold ........................................
Water Outlet .......................................  2-388 ................ Water Pump Puller ....................
RADIATOR
This task covers:
Testing and Repair (page 2-388)
INITIAL SETUP
Equipment Condition
Radiator removed (TM 9-2320-269-20-1).
TESTING AND REPAIR
NOTE
The procedures for testing and repairing the radiator can be found in TM 750-254.
TASK ENDS HERE
WATER OUTLET
This task covers:
a.
Disassembly (page 2-389)
c.
Inspection/Replacement (page 2-390)
b.
Cleaning (page 2-389)
d.
Assembly (page 2-390)
INITIAL SETUP
Tools
Personnel Required
Vise, machinist's
One
Wrench, open-end, 9/16-inch
Wrench, open-end, 11/16-inch
Equipment Condition
Materials/Parts
Thermostats removed (TM 9-2320-269-20-1).
Rags, wiping (item 42, appendix B)
Solvent, drycleaning
(item 49, appendix B)
2-388

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business