|
|
TM 9-2320-269-34-1
ETHER START CONTROL CABLE
This task covers:
a Removal (page 2-369)
c.
Inspection/Replacement
b. Cleaning (page 2-371)
d.
Installation (page 2-371)
INITIAL SETUP
Tools
Materials/Parts
Chisel, cold, hand, 3/8-inch
Rags, wiping (item 42, appendix B)
Hammer, ball-peen, machinist's,
1-lb
Personnel Required
Key, socket head screw, 5164-inch
Screwdriver, flat-tip, 1/4-inch
One
Wrench, open-end, 7/16-inch
Equipment Condition
Left side hood panel raised
(TM 9-2320-269-20-1).
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
WARNING
Ether fumes are flammable under pressure and can explode. To avoid serious injury or death, do not
smoke, allow open flame nearby, or hit the ether cartridge with tools.
1.
Cable stop (1)
Screw (2)
Using 7/16-inch open-end wrench and
1/4-inch flat-tip screwdriver, unscrew
and take out.
2-369
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |