|
|
TM 9-2320-269-34-1
INTAKE MANIFOLDS
This task covers:
a. Removal (page 2-226)
d. Inspection/Replacement (page 2-229)
b. Disassembly (page 2-228)
e. Assembly (page 2-230)
c. Cleaning (page 2-229)
f. Installation (page 2-230)
INITIAL SETUP
Tools
Materials/Parts - Continued
Handle, ratchet, 3/8-inch drive
Rags, wiping (item 42, appendix B)
Screwdriver, flat-tip, 1/4-inch
Solvent, drycleaning (item 49, appendix B)
Socket, 3/8-inch drive, 9/16-inch
Wrench, open-end, 3/8-inch
Personnel Required
Wrench, open-end, 7116-inch
Wrench, open-end, 1/2-inch
One
Wrench, open-end, 9/16-inch
Wrench, open-end, 7/8-inch
Equipment Condition
Wrench, open-end, 15/16-inch
Fuel injection pump removed (page 2-278).
Materials/Parts
Ether starting aid and bracket removed
Gasket, intake manifold
only).
Lockwasher, cable bracket
ACTION
LOCATION
ITEM
REMARKS
NOTE
This procedure covers left side intake manifold except where noted.
REMOVAL
1. Intake manifold (1)
Screen (2)
Take off.
2. Cable bracket (3)
Screw (4) and lock-
a. Using 9/16-inch open-end wrench, un-
washer (5)
screw and take off.
b. Get rid of lockwasher (5).
2-226
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |