Click here to make tpub.com your Home Page

Page Title: Table 9-3. Conventional Ammunition Demilitarization Facilities and Capabilities(DESCOM)-Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1300-277
Table 9-3. Conventional Ammunition Demilitarization Facilities and Capabilities(DESCOM)-Continued
PINE BLUFF ARSENAL
Disassembly
facilities
Washout
furnace
Detonation
Open burning
Current demilitarization capability is limited to white phosphorus (WP) munitions. The
No open burning as
existing WP Demilitarization Facility Capability includes equipment and tooling for
established by
removal of WP from a variety of munitions.
1977 Clean Air Act.
Operational limitations require equipment modifications for M34 Grenade M110, 155mm
The Arkansas Air Pol-
WP and CBU-12 and CBU-22 together with refurbishing line operation equipment.
lution Control Code
requires a state
permit to open burn.
There is a WP Demilitarization and Download Facility, Incinerator Cluster together with
supporting pollution abatement systems which provides a demilitarization capability
No permit has been ap-
for non-toxic chemical munitions.
plied for all white
phosphorus waste
1. Incinerator complex:
being held pending
completion of the
a. Rotary Kiln Furnace with After Burner Scrubber System.
incinerator complex.
b. Chain Grate Conveyor Furnace with After Burner Scrubber System.
c. Fluid Bed Incinerator with Scrubber System and Associated Slurry Preparation.
2. Download Facility
3. WP Demilitarization Facility
4. Colored Smoke Demilitarization Facility.
Change 2 9-18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business