TM 9-1300-277
MCALESTER ARMY AMMUNITION PLANT
Disassembly
facilities
Washout
furnace
Detonation
Open burning
Bldg 100-
Bldg 186-
Bldg 452-
52 detonation sites.
Open area.
Disassembly breakdown
Disassembly and
Deactivation furnace
and primer punch out
steamout plant op-
APE 1236 with KIT E
Detonation restriction:
Burning restriction:
of cartridge case of
erational (40mm,
010 Air Pollution
plant imposed explo-
Open burning plant
small arms ammunition
75mm, 90mm, 105mm,
System has been
sive limit 150 pounds
limitation to ex-
including 20mm and
106mm, 120mm, 60mm,
installed to Demili-
with 15 feet embank-
plosives, explo-
40mm.
81mm, 4.2 inch,
tarize Small Arms
ments and 4 feet
sive materials,
2.75, 5 inch).
Ammunition, Primers,
earth cover
and pyrotechnic
Bldg 126 & 130
Pollution abatement
Fuzes, Boosters, and
500 lb explosive limit
flares.
Disassembly and defuz-
not required.
Detonators.
has been approved for
ing of projectiles/
the demolition range.
warheads (3 inch,
Bldg 445-
5 inch, 6 inch, 90mm,
Washout plant non-oper-
Bldg 662-
120mm, 5-inch Rocket
ational (8 inch,
Small Arms and Primer
Warhead.)
16-inch projectiles).
Popping Furnace not
Pollution abatement
operational (75%
Bldg 198 & 201
not required.
complete) pending
Disassembly, breakdown
completion of equip-
and defuze (2.75
ment installation of
Rocket Warhead, 75mm,
pollution control
5-inch Rocket Warhead,
system.
5-inch Rocket Motor,
4.2 Mortar).
Bldgs 109-111-
Disassembly, breakdown,
and defuzing of large
projectiles (8 inch
thru 16 inch).
Bldg 205-
Disassembly, breakdown,
and defuzing of large
projectiles (6 inch,
8 inch, 16 inch).
USE EXISTING LAP FACILITIES FOR DISASSEMBLY AND BREAKDOWN.