|
|
TM 9-1300-277
Table 9-4. Army OCONUS Capabilities Summary
EOD
Detonation
Open Burning
Location
Capabilities
Capabilities
Capabilities
Capabilities
ITALY
Very limited
None
None
None
GERMANY
Miesau
None
APE 1236 W/KIT E010
None
None
Baumholder
Very limited
None
600 lb limit
600 lb limit
1/2 day/month
1/2 day/month
Grafenwohr
Very limited
None
500 lb limit
Very limited
UNITED KINGDOM
Caerwent
None
None
None
Propellant up
to 1/2 kilo
Otterburn
None
None
6 detonation sites
None
150 lb limit
SPAIN
Very limited
Furnace to be
Very limited
Very limited
installed - 1984
HAWAII
Very limited
APE 1236 to be
None
None
installed by FY
1985 W/KIT E010
JAPAN
Marine base
Capability
25 lb limit
None
Mt Fuji
Capability
Small furnace
500 lb limit
None
(one item at a time)
(not readily
available)
PHILLIPPINES
Subic Bay
Capability
APE 1236 W/KIT E010
25 lb limit
Limited
KOREA
Demil by Korea
None
None
None
EOD
ALASKA
Ft Richardson
Capability
APE 1236 W/KIT E010
None
None
Change 2 9-18.1 (9-18.2 blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |