TM 9-1300-277
Table 9-2. Conventional Ammunition Demilitarization Facilities and Capabilities(AMCCOM)-Continued
UMATILLA DEPOT ACTIVITY
Disassembly
facilities
Washout
furnace
Detonation
Open burning
Bldg 614-16,500 sq
Bldg 487-
Bldg 206-
24 detonation sites.
Open burning site.
ft.
APE 1300 Plant w/o
APE 1236 W/KIT E010
Center substantial di-
water treatment
Detonation restriction:
viding wall with
system.
50 lb above ground;
operational bays.
Requires refurbish-
100 lb with 2 ft.
Power conveyors.
ing, operational
earth cover.
APE disassembly and
checkout and new
breakdown equipment.
boiler system.
Bldgs 601-606-
System requires
Disassembly barricade
water treatment
Oregon Department of Environmental Quality
for remote disas-
and charcoal
currently permits open burning/open deto-
sembly (television
filter system.
nation to be conducted in accordance with
not operational).
Utah Study criteria. However, open burn-
ing/open detonation future operation is
Bldg 608-18,400 sq
under review by Department of Environmental
ft.
Quality.
Essentially same con-
figuration as Bldg
614 with same equip-
ment and use.
Change 2 9-14
|