TM 9-1300-277
TOOELE ARMY DEPOT
Bldg 1375- 22,264 sq
Bldg 45-
North area-
North area-
North Area:
ft.
APE 1300 Plant is op-
Bldg 1320
9 detonation sites
Open burning sites
Center substantial di-
erational. Requires
APE 1236 W/KIT E010
with electrical
available.
viding wall with
charcoal filter sys-
firing system.
operational bays.
tem.
South Area:
Power conveyors.
Detonation restriction:
Open burning sites
Powder collection sys-
South area-
592 lb maximum above
available.
tem.
APE 1236 W/KIT E010
ground; 5000 lb
Full complement of
below ground with
APE disassembly and
7 feet earth cover.
breakdown equipment.
Cross Flow Scrubber
or Dry Particulate
Each detonation is
Bldg 1303-
Control System.
dependent on weather
Disassembly barricade
conditions, wind
for remote, disas-
direction, tempera-
sembly/sectioning
ture, inversion
munitions with power
layer, and air
hacksaw. Closed
quality.
circuit television.
South Area:
24 detonation sites
with electrical
firing system.
Detonation restriction:
592 lb maximum above
ground; 10,000 lb
below ground with
10 feet earth cover.
Change 2 9-13
|