Click here to make tpub.com your Home Page

Page Title: TOOELE ARMY DEPOT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-1300-277
TOOELE ARMY DEPOT
Bldg 1375- 22,264 sq
Bldg 45-
North area-
North area-
North Area:
ft.
APE 1300 Plant is op-
Bldg 1320
9 detonation sites
Open burning sites
Center substantial di-
erational. Requires
APE 1236 W/KIT E010
with electrical
available.
viding wall with
charcoal filter sys-
firing system.
operational bays.
tem.
South Area:
Power conveyors.
Detonation restriction:
Open burning sites
Powder collection sys-
South area-
592 lb maximum above
available.
tem.
APE 1236 W/KIT E010
ground; 5000 lb
Full complement of
below ground with
APE disassembly and
7 feet earth cover.
breakdown equipment.
Cross Flow Scrubber
or Dry Particulate
Each detonation is
Bldg 1303-
Control System.
dependent on weather
Disassembly barricade
conditions, wind
for remote, disas-
direction, tempera-
sembly/sectioning
ture, inversion
munitions with power
layer, and air
hacksaw. Closed
quality.
circuit television.
South Area:
24 detonation sites
with electrical
firing system.
Detonation restriction:
592 lb maximum above
ground; 10,000 lb
below ground with
10 feet earth cover.
Change 2 9-13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business