|
|
TM 9-1300-277
Table 9-2. Conventional Ammunition Demilitarization Facilities and Capabilities(AMCCOM)-Continued
SIERRA ARMY DEPOT
Disassembly
facilities
Washout
furnace
Detonation
Open burning
Bldg 403-10,800 sq
None.
APE 1236 W/KIT E010
14 detonation sites
Open burning site.
ft.
with electrical
Partial center sub-
.
firing system
Open burning restric-
stantial dividing
tion: Limited to
wall with opera-
*Local detonation re-
explosives and ex-
tional bays.
striction- 10,000 lb.
plosive contaminated
Power conveyors.
combustible waste.
Powder collection sys-
Deactivation furnace
tem.
operation licensed
Detonation and open burning operations li-
APE disassembly and
by State of California
censed by State of California, Lassen
breakdown equip-
Lassen County.
County.
ment.
Bldg 640- 20,520 sq
ft.
Center substantial di-
viding wall with
operational bays.
Power conveyors.
Powder collection
system.
APE disassembly and
breakdown equip-
ment.
*10,000 pounds per shot, number of shots per day limited only by time required to set up shots and clean the air. Normal operation calls for 1 - 14 shots at one
minute intervals starting from 1430 to 1530 each weekday.
Change 2 9-12
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |