| ||||||||||
| 
 
  | 
![]() TM 
9-1270-219-13&P 
AADS Preliminary Test. Perform 
a 
Set S16 to HTR CCHK and 
b. H e a t e r 
Test. 
with 
the 
Digital 
(DVM) 
set 
to 
Resistance 
Test, 
as 
shown 
in 
using 
the 
ohms check that the resistance between test 
Multimeter set to the lowest resistance range. Check that 
p o i n t s 15 (+ve) and 16 on the Test Set is 
t h e resistance between the pitot head and the helicopter 
87 ohms + 10 ohms. 
bonding point on the AADS body is less than 0.2 ohm. 
5-6. 
AADS 
Functional 
Tests. 
Temperature Sensor Initial Check. 
c. 
(1) Set S16 to TEMP and with the Digital 
a. A n g u l a r O u t p u t s A c c u r a c y T e s t . 
Voltmeter set to Ohms check that the 
resistance between test points 15 (+ve) 
a n d 16 on the test set is 500  200 
(1) 
C o n n e c t the AADS for test as shown 
ohms. 
in figure 5-2. Set test set switches CB1 
and CB2 to ON and check that the 
associated 
indicator 
lamps 
illuminate. 
d. Static Pressure Leak Test. 
L o c a t e pitot head in clamped position 
(2) 
i n checking fixture as shown in figure 
(1) Set test set switches CB1 and CB2 to 
OFF. 
Remove 
the 
interconnection 
harness from the AADS and release 
the 
pitot 
head 
from 
the 
clamped 
Set S16 to Sin ∝ a n d u s i n g t h e D V M 
(3) 
position. 
set to dc volts measure and record the 
voltage 
across 
test 
points 
TP 
15 
(2) Loosen the two threaded joints of the 
(positive lead) and TP 16 (negative 
pitot 
head 
adaptor 
by 
lead) on the Test Set. (See fig. 1-32). 
t u r n i n g the components of the adapter 
1 
turn 
counterclockwise. 
through 
Set S16 to Cos ∝ and using the DVM 
(4) 
set to dc volts measure and record the 
(3) Push the pitot head adapter over the 
voltage across test points 15 (+ve) and 
p i t o t head until resistance is felt and 
16 on the Test Set. 
tighten 
the 
adapter 
handtight. 
See 
Verify that the combination plot of 
(5) 
the values obtained at (3) and (4) 
( 4 ) S c r e w t h e a d a p t e r s i n t o t h e PT a n d PS 
above lies within the specified pass 
connectors on the body of the AADS. 
band of figure 5-4. 
(5) 
Connect 
the 
pneumatic 
circuit 
shown 
in figure 5-6. 
Set 
S16 
to 
Sin 
and 
using 
the 
(6) 
DVM set to dc volts measure and 
r e c o r d the voltage between test points 
(6) 
Close 
the 
capacity 
tank 
vent 
and 
15 (+ve) and 16 on the Test Set. 
shut-off valves. Close the tester vent 
valve and open the pressure source 
valve. Apply a pressure of 255 - 265 
Set 
S16 
to 
Cos 
and 
using 
the 
(7) 
Kn (3.2-3.5 in. Hg). 
DVM set to dc volts measure and 
r e c o r d the voltage between test points 
(7) 
Open 
the 
capacity 
tank 
shut-off 
15 (+ve) and 16 on the Test Set. 
valve. 
Verify that the combination plot of 
(8) Start the stopwatch when the pressure 
(8) 
falls to 250 kn (3.1 in. Hg) and check 
the values obtained at tests (6) and (7) 
that after 110 seconds the pressure is 
above lies within the specified pass 
more than 50 kn (0.12 in. Hg). 
band of figure 5-5. 
5-3 
 | 
| 
 
 Privacy Statement - Press Release - Copyright Information. - Contact Us  |