Click here to make tpub.com your Home Page

Page Title: Load and Tiedown Removed Components and Support Equipment.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1520-238-S
b. Tiedown Fuselage Tailboom Fitting. Re-
(5) Position horizontal stabilator on left
side of trailer platform, under helicopter
move quick release pin holding FS 450 jack
right engine exhaust. Cushion with
pad wire deflector. Secure wire deflector in
cushioning material (D5) and secure
open position. Install two 10,000 pound tie-
cushioning in place with tape (D13).
down devices/chains  (items 55 and 56,
at
fuselage
(6) Position two forward and aft ammuni-
tion feed fairings on right side of trailer
station 450 tiedown fitting (fig. 43, 44, or
platform, forward of area weapon turret
45). Tiedowns will pass through FS 450
container. Load wrapped fairings and
fitting.
access covers with ammunition feed
c. Remove  Sling,  Crane,  and  Guide
fairings.
Ropes. After securing helicopter tie-
downs, uncouple crane lifting hook from air
vehicle sling link (lifting eye) and remove
crane from loading area. Remove sling pins
from main rotor head, detach sling, and un-
tie guide ropes from tail landing gear arms.
418.4 Load and Tiedown Removed Components
and Support Equipment.
a. Tactical Shipment. Figure 45.
(1) M230 gun, turret, Hellfire launchers,
2.75 inch rocket launchers, tail rotor
blade racks, vertical stabilizer, horizon-
tal stabilator, boxed fairings and boxed
ground support equipment will be
loaded on separate truck for transport.
(2) Kneeling cart and hoses, vertical stabi-
lizer sling, MRB sling and air vehicle
sling will be shipped on separate truck.
These ground support items are to be
wrapped and packaged per paragraph
(3) Install 5,000 pound tiedown straps to
secure cargo. Use enough tiedowns to
properly secure these support equip-
ment items to a separate truck.
b. Logistical Shipment. Figure 43 or 44.
(1) Position packed gun turret container on
right side of trailer platform, under top
end of stowed stabilizer.
(2) Position packed gun container on right
side, forward end of trailer.
(3) Position one packed Hellfire launcher
container on right side of trailer plat-
form under helicopter left engine ex-
haust, and one packed Hellfire launch-
er container on left side, forward end of
trailer.
(4) Position two packaged tail rotor blades
on left side, forward end of trailer, in-
board of Hellfire launcher.
Change 1
415

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business