Click here to make tpub.com your Home Page

Page Title: Section V. DS AND GS TESTING PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6350-262-14/11
NAVELEX 0967-LP-466-9112
TO 31S9-4-39-1
charged.  These batteries should be
accordance with sub paragraphs (1) through (4) above
may now be stored for a maximum of 6 months at 70'-
allowed to remain on charge for a
75'F. before requiring recharge. It is not recommended
period of approximately 48 hours.
that batteries be stored for extended periods of time
(4) The battery should now be tested in
accordance with the instructions in section d.
above 80'F. since this will significantly reduce the
allowable storage time and may reduce the service life
(5)  Batteries  recharged  and  tested  in
of the batteries.
Section V. DS AND GS TESTING PROCEDURES
7.14. General
b. Procedure. Refer to table 7-1.
This section
contains a performance standard test
procedure for
use by direct support and general support
maintenance
personnel to determine whether the
performance
of  the  repaired  monitor  cabinet  is
satisfactory.
WARNING
110-V ac is present at TB- I of power
7-15. Performance Standards
supply. Input power shall be removed
a. Test Equipment and Materials. VOM TS352B, or
from  the  monitor  cabinet  before
equivalent.
removing the terminal barrier cover.
Change 2 7-6.3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business