CHAPTER 3
O R G A N I Z A T I O N A L MAINTENANCE INSTRUCTIONS
Section I. TOOLS AND EQUIPMENT
3-1. Special Tools and Equipment
No special tools and equipment are required for
organizational maintenance of the grid wire sensor.
Section II. REPAINTING AND REFINISHING INSTRUCTIONS
number MIL-P-8585 and finished with gray vinyl
3-2. General
paint, Federal Standard 595 color chip 26492. Use
Metal surfaces for the grid wire sensor are painted
only these paints for paint touchup and repainting.
with a durable undercoat and finish paint. Under
Refer to SB 11-573, Painting and Preservation
normal conditions, paint will permanently remain on
Supplies Available for Field Use for Electronics
the surfaces and will require no retouching or
Command Equipment.
repainting. However, the paint may become chipped
or worn away from accidental causes, or being
subjected to abrasive damage of various types. If
3-4. Procedure
such damage occurs, the damaged area should be
Instructions for touchup painting and repainting are
retouched, or repainted, both for appearance and to
contained in TB 746-10, Field Instructions for
protect the steel cases from corrosion.
Painting and Preserving Electronics Command
3-3. Paint To Be Used
Equipment. TB 9-213, Painting Instructions for Field
Use, may be referenced for instructions on the care of
The grid wire sensor junction box metal surfaces are
painting equipment.
primed with zinc chromate primer, specification
Section III. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
services to be performed are listed and described in
3-5. General
The grid wire sensor will require a minimum' of
organizational maintenance since the J-SIIDS must
minimum inspection requirements. Defects during
be kept in continuous operation. To assure maximum
operation of the unit will be noted for future
operational readiness it is necessary that the
corrections to be made as soon as operation has
equipment be inspected so defects may be discovered
ceased. Stop operation immediately if a deficiency is
and corrected before the result in serious damage or
noted during operation which would damage the
failure.
equipment. Record all deficiencies together with the
corrective action taken on a DA Form 2404.
3-6. Check and Services
The necessary preventive maintenance checks and
Table 3-1. Organizational Preventive Maintenance Checks and Service
Q-Quarterly
Work
Items to be Inspected
Sequence
Time
Procedure
Number
(M H)
1
JUNCTION BOX ASSEMBLY
Visually inspect the enclosure interior for rust corrosion and foreign matter. Check for loose
missing screws. nuts, fasteners and grommets. See figure C-l for location.*
2
HOUSING COVER
Verify cover is fastened securely in position.*
3-1
|