|
|
TM 5-5430-209-12
1
SECOND-RING STAVES
2
STRIP GASKET
3.
WEDGE GASKET
4.
BOLT
5.
OPEN BOLTHOLE
ME 5430-209-12/7-1
Figure 7-1. Second-ring staves dressed and ready for
installation.
(2) Remove a bolt from the bottom chime
near each vertical seam which has a scaffold bracket (1,
pole foot spike.
(3) Remove gin pole components from
storage tank erection outfit. Assemble gin pole with a
foot spike.
Figure 7-2. Hoisting second-ring stave.
(4) Raise gin pole (1, fig. 7-2). As the pole is
being raised, attach headblock (2) to the headblock eye.
Push foot spike through an open bolthole in the chime.
With the pole in raised position, lash it to a scaffold
bracket (1, fig. 3-17).
7-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |