TM 43-0002-31
3-29. M288 Mounting Kit.
a. Priorities for Destruction.
(1) Fog Oil Tank
(2) Frame Assembly
(3) Mounting Cage Assembly
b. Preferred Methods of Destruction. Mechanical
means and demolition.
c. Mechanical Means. Concentrate on the frame
and mounting cage assemblies. Using cutting
torch, cut angle iron supports as shown in figure.
d. Demolition. Drain fog oil tank first if possible.
Figure 3-37. Explosive Charge Location for
Fasten 1/2 pound explosive charge to side of
Tank Unit - M288 Mounting Kit,
fog oil tank as shown in figure and detonate.
Smoke Generator.
3-30. Filter Units, Gas-Particulate: 12 cfm and
20 cfm.
WARNING
When using demolition or fire as a method of
destruction-for chemically contaminated equip-
ment (alarms, filters, etc.) personnel should
mask and move upwind of the site. If unable to
move upwind of the site, personnel must wear
protective clothing and masks.
a. Filter Units.
FILTER UNIT, GAS-PARTICULATE: Armored
Ambulance, 12 CFM, M14 (not installed)
FILTER UNIT, GAS-PARTICULATE: Hospital, 12
CFM, ABC-M7A1
FILTER UNIT, GAS-PARTICULATE: Tank, 12
CFM, ABC-M8A2 and ABC-M8A3 (not installed)
FILTER UNIT, GAS-PARTICULATE: Tank, EMD,
20 CFM, M13 and M13A1 (not installed)
b. Priorities for Destruction:
(1) Air purifier (12 cfm) or precleaned and
particulate filter assembly (20 cfm)
(2) M13A1 headpieces
(3) Hose assemblies
(4) Transformer (M7A1) or circuit breaker
and switch
(5) M3 heater and M18 gas filter (M13 and
M13A1).
Figure 3-36. Cutting Locations for
c. Preferred Methods of Destruction. Mechani-
Frame Assembly - M288 Mounting Kit,
cal means and fire.
Smoke Generator.
e. Fire (para 2-14). Burn with combustible mate-
rials.