TM 38-100/NAVSUP PUB 572/AFMAN 23-210 MCO 4450.14/DLAM 4145.12
Figure 7-1. Check sheet for storage and materials handling training program.
The three parts, covering Detailed Training Outline,
7-6. The Three Phases of Instruction.
Storage of Materials, and Principles of Materials
a. Study of principles. The first phase of the
Handling can be adapted to the needs of the installation
program should center around the principles and
or activity.
fundamental facts basic to operations of which
(2) Classes. All key personnel, military and
supervisors and key personnel should have an
civilian, should be included in this phase. Experience
understanding.
has indicated that a minimum of 8 to 10 hours will be
required to complete this portion of the training program.
(1) Text. The material in the Conference
Ordinarily classes should be
Leader's Guide, section 3, Storage and Materials
Handling Training Program for Supervisors, will be used
as the basic guide for the first phase of the program.
7-2
|