|
|
TM 32-6110-003-24&P
m. Connecting Link Removal and Replacement. Refer to figures 5-3 and 5-5 and proceed as follows:
(1) Remove bottom cover (3) in accordance with paragraph 5-10a and/or high voltage shield (5) in
accordance with paragraph 5-10b depending on location of connecting link being replaced.
(2) Refer to figure 5-5. Remove connecting link (61) from terminal board (58).
(3) To replace connecting link, position it on terminal board and secure in accordance with paragraph 5-
12j (TB2 and TB3) or 5-12K (TB1).
(4) Replace bottom cover (3) in accordance with paragraph 5-11c and/or high voltage shield (5) in
accordance with paragraphs 5-11b.
(5) Refer to section V of this chapter.
n. Component Shelf Removal and Replacement. Refer to figure 5-3 and proceed as follows:
(1) Remove top cover (2) and bottom cover (3) in accordance with paragraph 5-10a.
(2) Remove RFI filter assembly (6) from the chassis in accordance with paragraph 5-10c, steps (1)
through (4) and high voltage shield (5) in accordance with paragraph 5-10b.
(3) Remove relay K4(23) in accordance with paragraph 5-12c.
(4) Remove relays K1, K2, and K3 (30) in accordance with paragraph 5-12e.
(5) Remove socket XK4 (24) in accordance with paragraph 5-12d.
(6) Remove terminal board TB2 and TB3 (58) in accordance with paragraphs 5-12j.
(7) Remove insulating strip (60) in accordance with paragraph 5-12, step 1.
(8) Remove eight screws (25), eight lock washers (26), and flat washers (26A) that secure component
shelf (27) to the chassis.
(9) To replace component shelf (27), secure it to chassis with eight screws (25), eight lock washers (26),
and flat washers (26A).
5-30
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |