TM 32-5895-227-14&P
NOTE
2-4
CHECKING UNPACKED EQUIPMENT.
Equipment will be reported not ready
a.
Inspect the equipment for damage during
only if components affecting safety
shipment. If the equipment has been damaged, report
or operation are missing.
the damage on SF Form 364, Report of Discrepancy.
c.
Inspect the equipment for modifications.
b.
Check the equipment received against the
Modified equipment will have the MWO number on the
component listings (tables 1-1 and 1-2) and the packing
nomenclature plate. Also inspect for application of
slip. Report all discrepancies .
current MWO's. (Current MWO's applicable to the
equipment are listed in DA PAM 310-4. )
Section IV. INSTALLATION INSTRUCTIONS
2-5 TOOLS, TEST EQUIPMENT, AND MATERIALS
2-6 INSTALLATION AND CONNECTIONS .
See
station of the AN/MSQ-71 baseline configuration. Refer
standard tools required for the AN/MSQ-71 baseline
to the particular station specifications for overall
configuration.
Refer to the particular station
configurations.
specifications for overall configuration requirements.
Table 2-1. Installation Tools
Item
Purpose
Applicable publication
Tool Kit, Electronic Equipment TK-100/G
As required for installation.
SC 5180-91-CL-S21
Tool Kit, Electronic Equipment TK-105/G
As required for installation.
SC 5180-91-CL-R07
Multimeter AN/USM-223
Test electrical circuits.
TM 11-6625-654-14
2-2
|