|
|
TM 32-5895-227-14&P
CHAPTER 2
SERVICE UPON RECEIPT AND INSTALLATION
Section I. SYSTEMS PLANNING
configuration of the Communications Central AN/MSQ-
2-1. SCOPE.
Refer to the particular station
71.
specifications for systems planning of the overall
Section II. SITE AND SHELTER REQUIREMENTS
overall configuration of the AN/MSQ-71.
2-2. SCOPE.
Refer to the particular station
specifications for site and shelter requirements of the
Section III. SERVICE UPON RECEIPT OF MATERIEL
b.
Unpacking Typical Multiple-Packed Wooden
2-3. UNPACKING. The instructions below are for
Box. A multiple-packed wooden box contains two or
typical packaging. Unpack all items as applicable.
more identical, consolidated, corrugated cardboard
cartons.
CAUTION
(1)
Using a metal-cutting tool, cut metal
Be careful when uncrating and
straps.
unpacking
the
AN/MSQ-71
(2)
Using a nailpuller, pull nails holding
components. Careless or hap hazard
cover.
use of tools may result in damage to
(3)
Remove cover.
package contents.
(4)
Remove and unpack cartons.
a.
Unpacking Typical Consolidated Wooden
c.
Unpacking Typical Wooden Crate.
Box.
(1)
Using a metal-cutting tool, cut metal
(1)
Using a metal-cutting tool, cut metal
straps at each corner edge of crate.
straps.
(2)
Using a nailpuller, remove nails
(2)
Using a nailpuller, pull nails holding
holding cover.
cover.
(3)
Remove cover.
(3)
Remove cover.
(4)
Remove nails from side and end crate
(4)
Open
moistureproof/vaporproof
panels.
barrier bag.
(5)
Remove panels.
(5)
Remove corrugated cardboard inner
(6)
Remove paper wrapping.
carton, bags, and envelopes.
2-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |