Click here to make tpub.com your Home Page

Page Title: Section V: GENERAL SUPPORT TEST PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 32-5865-218-24&P
GENERAL SUPPORT TEST PROCEDURES
Section V.
5-13.  General.
This section provides general support test
instructions to determine whether the performance of the repaired ECM
indicator panel or countermeasures control is satisfactory for return
to the user.
5-14.  ECM Indicator Panel Test.  Perform all the steps in table 5-1
Perform each step
to verify operation of the ECM indicator panel.
in table 5-1 in the sequence listed.
5-15.  Countermeasures Control Test.  Perform all the steps in tables
5-2 and 5-3 to verify operation of the countermeasures control.
Perform each step in tables 5-3 and 5-3 in the sequence listed.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business