CHAPTER 2
SERVICE UPON RECEIPT AND INSTALLATION
Section I. SITE AND SHELTER REQUIREMENT
(1) The grid wire sensor should be stapled to the
2-1. Siting
barrier or to a smooth foundation board which is
a. The site of grid wire sensor will be installed so
then attached to the barrier.
that each circuit pair will protect a barrier having a
(2) The barriers should be so that any penetra-
nominal area of 10 feet by 12 feet. (Refer to
tion through the barrier in excess of a 4 inch square
paragraph 1-9.) External power is not required at the
area results in a break in one or more of the grid
installation site.
wires.
b. Factors which must be considered in locating the
2-2. Shelter Requirements
grid wire sensor at the site to assure it performs its
The nominal area required for the installed grid wire
designed function to the maximum practical extent
sensor is stated in paragraph 2-1.
are as follows:
Section Il. SERVICE UPON RECEIPT OF MATERIEL
see if shipment is complete. Report all discrepancies
2-3. Unpacking
in accordance with paragraph 1-2. The equipment
There are no special instructions for unpacking the
should be placed in service even though a minor
grid wire sensor from its shipping container. Observe
assembly or part that does not affect proper
the usual precautions and requirements associated
functioning is missing.
with handling precision electronics equipment.
c. Check to see whether the equipment has been
modified. (Equipment which has been modified will
2-4. Checking Unpacked Equipment
have the MWO number on the top cover.) Check also
to see whether all currently applicable MWO's have
a. Inspect the equipment for damage incurred
been applied. (Current MWO's applicable to the
during shipment. If the equipment has been dam-
equipment are listed in USASA PAM 310-6 or DA
aged, report the damage on DD Form 6 (para. 1-2).
PAM 310-7 as applicable.)
b. Check the equipment against the packing slip to
Section Ill. INSTALLATION INSTRUCTIONS
2-5. Tools, Test Equipment, and Materials
2-6. Installation Instructions
Required for Installation
a. Figure 2-1 and 2-2 shows pertinent dimensions
and spacing that must be maintained in placing,
Table 2-1 lists all tools and equipment required for
mounting and attaching the junction box and grid
wire to walls, floors, ceilings, doors and other
installation tools required for installation of the grid
barriers.
wire sensor.
2-1