|
|
TM
9-2350-238-20-2
S WI T C H T O S E N S I N G S W I T C H E S E L E C T R I C A L
2-75.
MAINTENANCE OF LEVEL
WIND
LEAD ASSEMBLY (CONT).
INSTALLATION
Failure
to
remove
or
disconnect
the batteries before removing or
installing any electrical wiring
harness or lead may result in in-
jury
or
damaged
equipment.
1 Install
level
wind
switch
to
sensing
swit-
ches
electrical
lead
assembly
(1).
Connect
electrical lead 480 (2) to level wind
switch (3).
2 Install
clamps,
fasteners,
and
grommets
on level wind switch to sensing switches
electrical lead assembly (1).
3 Connect two electrical leads 480 (4)
to
right and left sensing switches (5).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |