|
|
TM
9-2350-238-20-2
1 Install
new
preformed
packing
(1),
new
9 Connect
traverse
motor
control
line
packing retainer (2), new tube
fitting
metal
tube
assembly
(23)
to
level
wind
locknut (3), and tube tee (4).
traverse
directional
control
solenoid
valve
(17).
2 Connect
level
wind
solenoid
valve
pressure line to tee metal tube assembly
10 Connect level wind solenoid valve input
pressure line nonmetallic hose assembly
(5) and tube assembly (6) to tube tee (4).
(24) to tube to boss tee (10).
3 Install new tube fitting locknut (7), flat
washer (8), and new preformed packing
11 Install
new
preformed
packing
(25)
and
tube reducer (26).
(9) on tube to boss tee (10).
4 Install tube to boss tee (10), new preform-
12 Connect
solenoid
valve
to
motor
input
ed packing (11), tube nipple (12), tube fit-
metal tube assembly (27) to level wind
ting
locknut
(13),
flat
washer
(14),
and
traverse directional control solenoid valve
new preformed packing (15).
(17).
5 Install level wind traverse directional con-
1 3 Install new preformed packing (28), flat
trol solenoid valve (16) and tighten tube
washer (29), new tube fitting locknut
fitting locknut (7) on tube to boss tee
(30), tube elbow (31), new preformed
(10).
packing (32), and external thread tube
reducer (33) on level wind traverse direc-
6 Install two level wind traverse directional
tional control solenoid valve (16).
control solenoid valves (16 and 17), six
new Iockwashers (18), and six hexagon
14 Connect solenoid valve motor control
capscrews
(19).
metal tube assembly (34) and traverse
motor control line tube assembly (35) to
7 Connect two electrical leads (20) to two
level wind traverse directional control
level wind traverse directional control
solenoid
valve
(16).
solenoid
valves
(16
and
17).
8 Install new preformed packing (21) and
tube reducer (22) on level wind traverse
directional control solenoid valve (17).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |