Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
1 Install
new
preformed
packing
(1),
new
9 Connect
traverse
motor
control
line
packing  retainer  (2),  new  tube
fitting
metal
tube
assembly
(23)
to
level
wind
locknut (3), and tube tee (4).
traverse
directional
control
solenoid
valve
(17).
2 Connect
level
wind
solenoid
valve
pressure line to tee metal tube assembly
10 Connect  level  wind  solenoid  valve  input
pressure  line  nonmetallic  hose  assembly
(5) and tube assembly (6) to tube tee (4).
(24) to tube to boss tee (10).
3 Install new tube fitting locknut (7), flat
washer (8), and new preformed packing
11 Install
new
preformed
packing
(25)
and
tube reducer (26).
(9) on tube to boss tee (10).
4 Install tube to boss tee (10), new preform-
12 Connect
solenoid
valve
to
motor
input
ed packing (11), tube nipple (12), tube fit-
metal  tube  assembly  (27)  to  level  wind
ting
locknut
(13),
flat
washer
(14),
and
traverse  directional  control  solenoid  valve
new  preformed  packing  (15).
(17).
5 Install level wind traverse directional con-
1 3 Install  new  preformed  packing  (28),  flat
trol  solenoid  valve  (16)  and  tighten  tube
washer (29), new tube fitting locknut
fitting locknut (7) on tube to boss tee
(30),  tube  elbow  (31),  new  preformed
(10).
packing  (32),  and  external  thread  tube
reducer (33) on level wind traverse direc-
6 Install  two  level  wind  traverse  directional
tional  control  solenoid  valve  (16).
control solenoid valves (16 and 17), six
new Iockwashers (18), and six hexagon
14 Connect solenoid valve motor control
capscrews
(19).
metal  tube  assembly  (34)  and  traverse
motor  control  line  tube  assembly  (35)  to
7 Connect  two  electrical  leads  (20)  to  two
level  wind  traverse  directional  control
level  wind  traverse  directional  control
solenoid
valve
(16).
solenoid
valves
(16
and
17).
8 Install  new  preformed  packing  (21)  and
tube  reducer  (22)  on  level  wind  traverse
directional  control  solenoid  valve  (17).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business