Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
1 Install loop clamp (1), new lockwasher (2),
8 Connect  shuttle  valve  to  three-spool
and  hexagon  head  capscrew  (3)  on
shuttle
valve  metal  tube  assembly  (32)  and  shut-
valve to selector valve metal tube
tle valve to three-spool valve metal tube
assembly (4).
assembly (33) to tow winch brake shut-
tle valve (5).
2 Install
tow
winch
brake
shuttle
valve
(5),
two
new
Iockwashers
(6),
and
two
9 Install two new preformed packings (34).
machine
screws
(7)
on
three-spool
valve
Connect  three-spool  valve  control  line
(8).
metal tube assembly (35) and three-spool
valve  control  line  metal  tube  assembly
3 Install
two
hand
pump
direct
selector
(36).
linear
valves
(9
and
10)
with
two
hexagon
head capscrews (11), two new lock-
10 Secure
three-spool
valve
control
line
washers (12), and two hexagon plain nuts
metal tube assembly (35) and three-spool
valve  control  line  metal  tube  assembly
(13).  Install  new  preformed  packing  (14),
flat washer (15), new tube fitting locknut
(36) to three-spool valve (8) with four
(16), and tube elbow (17) on hand pump
counterbalance  manifold  three-spool
direct selector linear valve (10).
valve  flange  clamp  halves  (37),  eight
new Iockwashers (38), and eight hex-
4 Install
new
preformed
packing
(18),
flat
agon head capscrews (39).
washer (19), new tube fitting locknut
11 Install
two
new
preformed
packings
(40).
(20), and tube elbow (21) connecting out-
board  selector  valve  metal  tube  assembly
Connect  two  adapter  to  manifold
hydraulic winch metallic tubes (41) to
(22)
to
winch
control
cylinder
(23).
manifold  assembly  counterbalance  (42).
5 Install two new preformed packings (24)
and two tube
nipples (25) connecting
12 Install two new preformed packings (43)
shuttle valve
to selector valve metal tube
and  two  new  preformed  packings  (44).
assembly (4)
to tow winch brake shuttle
Secure elbow to adapter metal tube
valve (5) and
hand pump direct selector
assembly (45) and elbow to adapter con-
linear valve (10).
trol  line  metal  tube  assembly  (46)  to  two
adapter to manifold hydraulic winch
6 Install two new preformed packings (26)
metallic  tubes  (41)  with  two  tow  winch
and two tube reducers (27) on tow winch
counterbalance  manifold  clamp  pipe
brake shuttle valve (5).
flanges  (47),  four  counterbalance
manifold three-spool valve flange clamp
7 Install
two
new
preformed
packings
(28),
halves (48), eight new Iockwashers (49),
two flat washers (29), two new tube fit-
and eight hexagon head capscrews (50).
ting locknuts (30), and two tube elbows
(31) on three-spool valve (8).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business