|
|
TM
9-2350-238-20-2
Install
angle
bracket
(7),
two
hexagon
3
8
Connect
two
boom
cylinder
hose
head
capscrews
(8),
two
new
Iockwashers
assemblies (18 and 25) to two boom
control cylinder assemblies (24).
(9), and two hexagon plain nuts (10) on
boom cylinder tube-to-hose manifold (11).
Install two new preformed packings (26)
9
4
Install
new
preformed
packing
(12)
and
and two tube nipples (27) on two boom
connect
manifold
to
elbow
tube
assembly
control cylinder assemblies (24), and in-
stall two new preformed packings (28)
(13) to boom cylinder tube-to-hose
manifold (11).
and two tube nipples (29) on boom
cylinder tube-to-hose manifold (11).
Install
two
split-flange
clamp
halves
(14),
5
10
four new Iockwashers (15), and four hex-
Connect
two
boom
cylinder
hose
agon head capscrews (16) securing
assemblies (30) to two boom control
manifold to elbow tube assembly (13) to
cylinder assemblies (24) and boom
boom cylinder tube-to-hose manifold (11).
cylinder tube-to-hose manifold (11).
6
Install
new
tube
fitting
locknut
(17)
and
connect boom cylinder hose assembly (18)
to tube elbow (19).
7
Install two new preformed packings (20),
two
new
packing
retainers
(21),
two
new
tube fitting locknuts (22), and two tube
elbows (23) on two boom control cylinder
assemblies (24).
2-58.
MAINTENANCE OF BOOM WINCH THREE-SPOOL VALVE HYDRAULIC LINES
AND FITTINGS.
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |