Click here to make tpub.com your Home Page

Page Title: REMOVAL
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
2-52.
MAINTENANCE
OF
BOOM
AND
WINCH,
BOOM,
PULLEY,
AND
RELATED
PARTS
(CONT).
REMOVAL
Make sure MASTER switch is OFF
before  repairing  electrical  circuits.
Failure  to  observe  this  warning  could
result in injury to personnel.
1 Disconnect
boom
floodlight
electrical
lead
(1).
2 Raise  crane  boom  (2)  until  two  lower
hinge headless straight pins (3) are clear
of  cab  to  permit  removal.
Sling boom as shown to prevent
unbalanced  boom  action  which
could  cause  serious  injury.
Use hoist with 2000 lb (908 kg)
minimum lifting capacity to pre-
vent  injury  to  personnel  and
damage to equipment.
NOTE
Another  M578  Recovery  Vehicle
or an M88A1 Recovery Vehicle, if
available, may be used for lifting.
3
Install sling to crane boom (2) as shown.
Attach sling to hoist of 2000 lb (908 kg)
minimum capacity and take out slack to
support
weight
of
crane
boom.
4 Remove
two
hexagon
head
capscrews
(4),
two Iockwashers (5), and nut and pin
boom
hinge
pin
locking
plate
(6)
securing
each of two upper hinge headless straight
pins (7).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business