|
|
TM
9-2350-238-20-2
2 I n s t a l l lubrication
fitting
(3)
on
grooved
p u l l e y (2).
3 I n s t a l l inner bearing ring (4) in grooved
p u l l e y (2).
4 Install
two
boom
block
plates
(5
and
6)
to 7
Install
hexagon
plain
nut
(10)
and
boom block hook (7).
nut
to
100
ft-lb
(136
N-m).
Install
straight
shaft (11) to two boom block plates (5
5 Install
two
new
cotter
pins
(8)
to
hook
and 6) with attached parts.
(7).
Install two hexagon head capscrews (12),
8
6 Install
grooved
pulley
(2)
and
two
boom
two sleeve spacers (13), two new
plate spacers (9) to two boom block
Iockwashers (14), and two hexagon plain
plates
(5
and
6)
with
attached
parts.
nuts (15) to single tackle block (16).
2-147
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |