Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
1 8 Install
three
rod
end
clevises
(38)
and
at-
tached lower linkage controls (41) to
camlock  controls  support  (7)  and  secure
with  three  headed  straight  pins
(42)
and
three  new  cotter  pins  (43).
with  three  headed  straight  pins
(48)
and
19 Install  camlock  controls  support  (7)  and
three new cotter pins (49).
attached boom elevating and boom and
tow winch controls and linkage (44) to
21 Connect
two
electrical
connectors
(50)
interior of cab and secure with six new
to leads of filter bypass indicator light
Iockwashers  (45)  and  six  hexagon  cap-
(51).
screws
(46).
2 0 Install  three  rod  end  clevises  (40)  and
at-
tached lower linkage controls (41) to
three  spool  manifold  (47)  and  secure
2-135

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business