|
|
TM
9-2350-238-20-2
1 8 Install
three
rod
end
clevises
(38)
and
at-
tached lower linkage controls (41) to
camlock controls support (7) and secure
with three headed straight pins
(42)
and
three new cotter pins (43).
with three headed straight pins
(48)
and
19 Install camlock controls support (7) and
three new cotter pins (49).
attached boom elevating and boom and
tow winch controls and linkage (44) to
21 Connect
two
electrical
connectors
(50)
interior of cab and secure with six new
to leads of filter bypass indicator light
Iockwashers (45) and six hexagon cap-
(51).
screws
(46).
2 0 Install three rod end clevises (40) and
at-
tached lower linkage controls (41) to
three spool manifold (47) and secure
2-135
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |