|
|
TM
9-2350-238-20-2
2-46. MAINTENANCE OF BOOM ELEVATING, BOOM AND TOW WINCH CONTROLS
AND LINKAGE (CONT).
INSTALLATION
(CONT)
12 Install
winch
control
panel
bracket
(22)
15 Install
three
boom
and
tow
winch
manual
on
camlock
controls
support
(7)
and
control
levers
(29)
to
mounting
plates
secure
with
two
flat
washers
(23),
two
(31) of camlock controls support (7) and
new Iockwashers
(24),
and
two
hexagon
secure with three headed straight pins
capscrews (25).
(32) and three new cotter pins (33).
13 Install three shift handle boots (26),
16 Install three hexagon plain nuts (34) on
three new tiedown straps (27), and three
one end of two hydraulic valve shift rods
hexagon plain nuts (28) on three boom
(35 and 36), and hydraulic valve shift
and tow winch manual control levers
stud (37). Install two hydraulic valve
(29).
shift rods and hydraulic valve shift stud
into three rod end clevises (38) and
14 Apply
sealing
compound
(item
17,
appx
tighten
three
hexagon
plain
nuts
(34).
C) to threads in three shift lever handle
knobs (30) and install on three boom and
17 Install three hexagon plain nuts (39) on
tow winch manual control levers (29).
other end of two hydraulic valve shift
rods (35 and 36), and hydraulic valve
NOTE
shift stud (37). Install two hydraulic
Check
measurement of
lower
control
valve shift rods and hydraulic valve shift
linkage controls after reassembly of
stud into three rod end clevises (40) and
clevises and nuts to rods prior to in-
tighten three hexagon plain nuts (39).
stallation to manual control levers.
2-134
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |