|
|
TM
9-2350-238-20-2
M A I N T E N A N C E OF BOOM ELEVATING, BOOM AND TOW WINCH CONTROLS
2-46.
AND LINKAGE.
c. Installation
b. I n s p e c t i o n / R e p a i r
This
task
covers:
a. R e m o v a l
INITIAL
SETUP
Sealing compound (item 17, appx C)
Tools and Special Tools
Tiedown strap (3) (MS3367-3-9)
General mechanic's tool kit, automotive
References
TM
9-2350-238-24P-2
Materials/Parts
Cotter pin (6) (MS24665-353)
Cotter pin (3) (MS24665-355)
Equipment
Conditions
Drive screws (22) (MS21318-14)
Hydraulic pressure released. Refer to page
Epoxy resin adhesive (item 2, appx C)
2-8.
Lockwasher (4) (MS35338-43)
2-116 Forward right-hand
nonskid
Lockwasher (2) (MS35338-44)
metallic tread removed
Lockwasher (6) (MS35338-46)
Retaining ring (7) (7613189)
REMOVAL
Loosen seven shift lever turnlock fastener
1
studs (1) and remove cab assembly winch
controls access cover (2).
2
Remove seven shift lever panel retaining
rings (3), seven shift lever turnlock fast-
ener eyelets (4), and seven shift lever
turnlock fastener studs (1).
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |