Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
2-38.
MAINTENANCE
OF
OPERATOR'S
CUPOLA
(CONT).
INSTALLATION
Dry cleaning solvent is toxic and
flammable.  Wear  protective  goggles
and gloves and use only in well-
ventilated  areas.
If
operator's
cupola
ring
cushioning
pad
1
(1)  was  removed,  use  dry  cleaning  solvent
(item 10, appx C) and wire brush to
remove  residual  adhesive  from
mounting
surface of cupola ring (2).
2
Apply  epoxy  resin  adhesive  (item  2,  appx
C) to bonding surfaces of cupola ring (2)
and  operator's  cupola  ring  cushioning  pad
(1).  Install  operator's  cupola  ring  cushion-
ing pad. Center in cupola within 0.03 in.
(0.08 cm) total and bend tabs (3) on
operator's  cupola  ring  cushioning  pad
to
hold firmly in place.
NOTE
Cupola hinge torsion bar (4) shall be
installed so that cupola vehicle hatch
door (5) will have equal torsion in
open  and  closed  positions.
Install cupola vehicle hatch door (5) and
3
cupola hinge torsion bar (4).
4
Install lubrication fitting (6) in cupola hinge
torsion bar (4) and fill with grease (item
Install cupola spring anchor (7) on top of
5
cab and interlock cupola hinge torsion bar
(4).  Secure  cupola  spring  anchor  with  two
new  Iockwashers  (8)  and  two  hexagon
capscrews
(9).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business