Click here to make tpub.com your Home Page

Page Title: BOOM AND WINCH INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
2-10.
ELECTRICAL
CIRCUIT
TROUBLESHOOTING
(CONT).
Make  sure  MASTER  switch  is  OFF  before  repairing  electrical  compo-
nents. Failure to observe this warning could result in injury to
personnel.
Step 5. Remove  floor  plate  for  access  to  flow  divider  manifold  (1),  refer  to  page
2-116.  Disconnect  connector  (2)  from  solenoid  pressure  relief  valve  (3).
Place red probe in socket A (4) (lead-480). Ground black probe. Set
MASTER  switch  ON.  Set  LEVEL  WIND  switch  ON.  Press  either  sensing
switch to close. If multimeter indicates about 24 volts, go to step 6. If
multimeter  indicates  no  voltage,  repair  lead  480  between  rectifier  and
solenoid pressure relief valve, refer to page 2-66. Set MASTER switch OFF.
Set LEVEL WIND switch OFF. Connect connector.
Place red probe in socket B (1) (GND). Ground black probe. If multimeter in-
Step 6.
dicates continuity, notify direct support maintenance for replacement of
solenoid pressure relief valve (2). If multimeter indicates infinity, repair GND
lead,  refer  to  page  2-66.  Connect  connector  (3).
2-24

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business