Click here to make tpub.com your Home Page

Page Title: BOOM AND WINCH INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
2-10.
ELECTRICAL
CIRCUIT
TROUBLESHOOTING
(CONT).
Step 2.
Disconnect  both  leads  480  (1)  from  LEVEL  WIND  switch  (2).  Set  LEVEL
WIND  switch  ON.  If  multimeter  indicates  continuity,  go  to  step  3.  If
multimeter  indicates  infinity,  replace  LEVEL  WIND  switch,  refer  to  page
2-271. Set LEVEL WIND switch OFF. Connect leads.
Make
sure
MASTER
switch
is
OFF
before
repairing
electrical
com-
ponents. Failure to observe this warning could result in injury to
personnel.
Disconnect lead 480 (1) from either sensing switch. Place red probe in lead
Step 3.
480. Ground black probe. Set MASTER switch ON. Set LEVEL WIND
switch ON. If multimeter indicates about 24 volts, go to step 4. If
multimeter indicates no voltage, repair lead 480 between LEVEL WIND
switch and sensing switches, refer to page 2-66. Set MASTER switch OFF.
Set
LEVEL
WIND
switch
OFF.
Connect
lead.
2-22

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business