TM 9-2350-238-20-1
2-179. MAINTENANCE OF HEATER INSTALLATION KIT--AIR INTAKE BLOWER,
FUEL FILTER HEATERS, AND CONNECTING HARNESS; AND POWER PLANT
COMPARTMENT BRANCHED WIRING HARNESS (CONT).
INSTALLATION (CONT)
Untag and connect two shell connectors
11
If removed, install new marker bands (10)
4
(21 ) to line connections.
on power plant compartment branched
wiring harness (11 ).
Untag and connect two shell connectors
12
(22) to line connections on two fuel filter
Install power plant compartment branched
5
heaters (6).
wiring harness (11 ) in hull.
Untag and connect plug connector (23) to
13
Untag and connect plug connector (12) to
6
bulkhead disconnect to circuit breakers
blower assembly (1).
and electrical components branched wiring
harness at wall of driver's compartment.
Untag and connect shell connector (13) to
7
line connection on blower assembly
Wiring harnesses and leads are secured to
14
electrical solenoid (14).
the hull and components with loop clamps,
straps, clips, ground screws, etc. During
Install screw (15) to connect cable terminal
8
installation, make sure the wiring harness
(16) to ground.
or lead is secure, and all hardware is tight.
Untag and connect shell connector (17) to
9
electrical fuel pump (18).
Untag and connect shell connector (19) to
10
engine coolant heater control box (20).
2-1028