|
|
TM 9-2350-238-20-1
21
Install new tube fitting locknut (28), flat washer (29), and new preformed packing (30) on tube
elbow (31).
22
Install tube elbow (31) with attached parts on manifold (32).
23
Tighten tube fitting locknut (28) on tube elbow (31).
24
Connect hose assembly (27) to tube elbow (31).
25
Install tube assembly (33) on pressure switch (34).
26
If removed, install two new spacers (35) on two retaining straps (36).
27
Install two retaining straps (36), four new Iockwashers (37), and four screws (38) on tube
assemblies.
28
Install new tube fitting locknut (39) on lockout switch tee (40).
Install lockout switch tee (40) with tube fitting locknut (39) on bulkhead.
29
Connect tube assembly (33) to lockout switch tee (40).
30
Install new tube fitting locknut (41), flat washer (42), and new preformed packing (43) on tube
31
elbow (44).
32
Install tube elbow (44) with attached parts on lockout cylinder (45).
Tighten tube fitting locknut (41 ) on tube elbow (44).
33
Install hose assembly (46) on tube elbow (44).
34
35
Connect hose assembly (46) to lockout switch tee (40).
Tighten tube fitting locknut (39) on lockout switch tee (40).
36
Install tube assembly (47) on lockout switch tee (40).
37
Install new tube fitting locknut (48) on lockout switch tee (49).
38
Install lockout switch tee (49) with tube fitting locknut (48) on bulkhead.
39
40
Install tube cap (50) on lockout switch tee (49).
41
Tighten tube fitting locknut (48) on lockout switch tee (49).
42
Connect tube assembly (47) to lockout switch tee (49).
2-915
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |