| 
 | ||||||||||
| 
 |  TM 9-2350-238-20-1 1 Install slave receptacle connector (1) and four screws (2) in hull. Install slave receptacle and ground electrical lead (3) in hull. 2 Untag and connect cable terminal (4) of slave receptacle and ground electrical lead to slave 3 receptacle connector (1). 4 Untag and connect cable terminal (5) of slave receptacle and ground electrical lead to hull. Install voltage regulator to bulkhead disconnect, slave receptacle, and accessories panel special 5 cable assembly (6) in hull. 6 Untag and connect four shell connectors (7) to circuit breakers. 7 Connect cable terminal (8) of voltage regulator to bulkhead disconnect, slave receptacle, and accessories panel special cable assembly to slave receptacle connector (1). Connect plug connector (9) to voltage regulator. 8 Untag and connect receptacle connector (10), and install four washers (11) and four screws 9 (12) . Untag and connect receptacle connector (13), and install four washers (14) and four screws 10 (15). Wiring harnesses and leads are secured to the hull and components with loop clamps, straps, 11 clips, ground screws, etc. During installation, make sure the wiring harness or lead is secure and all hardware is tight. 2-122. MAINTENANCE OF AIR CLEANER BLOWER RELAY TO BULKHEAD DISCONNECT BRANCHED WIRING HARNESS. d. Reassembly This task covers: a. Removal b. Disassembly e. Installation c. Inspection/Repair INITIAL SETUP Materials/Parts General Safety Instructions Electrical wire (figure D-2, appx D) Nonmetallic rod (figure D-24, appx D) Failure to remove or disconnect References TM 9-2350-238-24P-1 batteries before removing or installing any electrical wiring harness or lead may result in injury or damaged Equipment Conditions equipment. 2-640 Batteries disconnected 2-952 Driver's seat removed 2-739 | 
| Privacy Statement - Press Release - Copyright Information. - Contact Us |